Fumetec Ltd were appointed by Robertson’s construction as contractor to carry out a new build project in the North East. The project involved the design, manufacture, installation, and commissioning of
- 19 No Industrial Fume Cupboards
- Associated PVC Extract systems
- Stainless Steel Benching
- Spray booth
- Associated laboratory fittings
The project was scheduled over 8 months in two phases and delivered on time in accordance to the schedule of works set out by Robertson’s Construction. The nature of the works ensured Fumetec worked closely with the principal contractor and designer ensuring attention to detail was given throughout the lifespan of the installation works meeting current deadlines and pre-planning arrangements.
Several photos have been attached to illustrate the workmanship and quality of the project.
Project Value: £350k